Why choose Polyflor's new Geotone QuickLay?
A premium, versatile and practical solution, ideal for quick turnaround projects, adhesive-free Geotone QuickLay combines Easy Fit Technology, Low Maintenance benefits and is optimised for Sustainable Performance.
What sets the new Geotone QuickLay PUR apart?
Easy Fit Technology
Subfloor preparation is significantly reduced as the embossed backing facilitates moisture dissipation from subfloors up to 97% RH.
Eliminating the need for full spread adhesive, with no drying and curing time, the moisture-tolerant double-sided QuickLay tape secures Geotone QuickLay in place.
Same Day install & walk
Adhesive-free Geotone QuickLay can be installed directly over damp subfloors (up to 97% RH) which means you can install and walk same day.
.jpg?width=1920&height=1920&name=Geotone%20Quicklay_Fountain%20Stone%206268_Magnetite%206269%20(1).jpg)
The double-sided QuickLay tape is fitted around the perimeter of the room, underneath all seams and doorways securing the flooring in place.
Two 25m rolls of tape are included with every roll of material purchased.

12 Steps to the Perfect Geotone QuickLay Installation
Installing QuickLay PUR is straightforward, making it an ideal choice for contractors and specifiers looking to streamline their projects.
Standard installation tools. Only Polyflor QuickLay recommended double-sided tape should be used.

Sweep or vacuum the floor area, check the condition of the subfloor and make good as necessary. A smooth and level subfloor remains critical for optimal performance. If the substrate is highly porous a suitable primer may be required.
Apply the QuickLay double sided tape around the perimeter of the room and at any doorways. 25mm away from the edge of the room.

Use the appropriate method to install Geotone QuickLay in the room. Allow a 25mm overlap at the seams and cut in to form a tight seam.

Measure 37.5mm away from the edge of the seam and mark with a straight edge or chalk line.

Apply the QuickLay double sided tape along the marked seams.

To ensure the QuickLay tape is firmly positioned correctly, simply press down with a hand roller or cork board.

Check you are happy with the positioning of the flooring and the measurements are correct.
Carefully peel away the protective film from all areas where the tape has been applied. NOTE keep the protective film as close to the floor as possible whilst peeling back.

Once complete, place the floor covering into position ensuring a ‘neat’ fit.

A hand roller or heavy roller can be used at all seams/perimeter immediately after installation to ensure sufficient contact has been made.

Geotone QuickLay can be hot welded at the seams and to coved skirtings upon immediate completion of the installation.
Polyflor Geotone QuickLay PUR is an exceptional flooring solution that combines innovative features, robust technical specifications, and ease of installation. Its compliance with safety standards and ability to meet evolving industry requirements make it an ideal choice for specifiers, contractors, and end customers alike. Whether you are working on a commercial project, an educational facility, or a healthcare environment, Geotone QuickLay PUR offers the perfect blend of performance, durability, and aesthetic appeal. By choosing Geotone QuickLay PUR, you are investing in a flooring solution that not only meets your immediate needs but also stands the test of time, delivering enduring value and satisfaction.